02 · CAD / drawing · mailto path
Drawing & CAD handoff after RFQ
Dashitou’s enquiry path opens your email client to shizhanhao6@gmail.com. There is no live enquiry API and no auto-issued reference number on this site. Keep one email thread; put company, revision, units, and controlling install node in the subject and body so the conversation stays together.
Define · why one thread and three marks
A drawing without a revision letter, a unit system, or a controlling install node forces a confirm-before-quote loop. The mailto draft from Enquire / RFQ is the start of the thread — not a ticket with a UUID. Company name + date + revision is enough identity for this mailto RFQ path. Do not invent a “reference UUID” in the subject.
Put revision, units (mm preferred unless the print says otherwise), and the controlling install node in the subject or the first body block. That matches field 03 on the RFQ checklist and the install-node language on the load-path primer. Leave tolerances, finish, packing, and private-label marking blank when the print does not fix them — blanks are easier to clarify than invented callouts.
Discuss · files, three marks, and what stalls a quote
This section is buyer facts about when a file is enough — not a format catalog. Final family fit is confirmed in enquiry against your print.
File types — when enough / when not
PDF (vector or searchable). Enough for a first review when dimensions, revision letter/number, and the controlling detail are readable on the sheet. Not enough when every critical size lives only in a 3D model, or when the PDF is a flattened scan with no revision block and no readable callouts.
DXF / DWG. Enough when the 2D geometry drives diameter, length, hole pattern, or bracket outline and the revision is stated in the email body (file name alone is fragile). Not enough as a lone drop with no units note and no “which layer / which detail rules” line — especially when the drawing set mixes obsolete and current sheets.
STEP (or similar 3D). Enough when embedment, fixture thickness, or complex bracket solids are model-driven and 2D alone would miss a clash. Not enough without a revision and units note in the body, or when the buyer expects a 2D acceptance print and only sends the solid.
Marked sketch photo. Enough for an early explore when dimensions, revision (even handwritten), and the install-node arrow are readable in the frame. Not enough for a hard price when tolerances, coating, packing, or private-label marking are blank yet the email asks for a firm quote — and not enough when the photo crops the revision block or the scale is guesswork.
Prefer vector or searchable PDF for review; include CAD when dimensions are driven by the model. Do not send unrelated catalogs as “drawings.”
Three required marks on every send
Every controlling file in the thread should carry these three marks in the subject, body, or clearly on the sheet:
- Revision — letter or number on the live sheet. Prefer one controlling revision per part family in the first send. If two details conflict, say which revision wins.
- Units — mm preferred unless the print already locks inch or another system. Write the unit in the body even when the sheet title block shows it; mixed units across attachments are a common stall.
- Controlling install node — one arrow sentence that rules the part, in the same language as the load-path primer: e.g. stone panel → concrete backup; beam / gusset bolted joint; equipment baseplate → slab; rainscreen skin → subframe; wedge through-fix or bonded rod in concrete. Mark the detail on the print that actually drives the part.
Node callout examples on the sheet: embedment and fixture thickness for a wedge through-fix; rod diameter / length and edge distance for a bonded accessory; bolt class and coating callout for a gusset; panel thickness and backup type for a stone bracket. That note saves a round of “which sheet is live?”
Common miss items that stall a quote
- Revision letter/number missing from file name and body
- Two or more revisions mixed in one send with no “controlling = Rev X” line
- Units omitted or inch/mm mixed across attachments without a note
- No install-node arrow sentence and no detail callout on the sheet
- Tolerances, coating / finish, packing, or private-label marking left blank while the email asks for a hard price
- Unrelated catalog PDFs attached as if they were the job print
How this page links the other two desks
Do not copy whole tables from the other guides — align fields only:
- RFQ checklist field 03 (specs or drawing) expects file name + revision + controlling-node callout. This handoff page is the sequence after mailto opens.
- Load-path primer supplies substrate / load case / install-node wording for the body “node + load” block. Use that vocabulary; do not invent grades or certificates here.
- Home buyer prep and contact What happens next 01–03 stay the entry path — this page does not add a new homepage module.
Agree · subject template and body copy block
Paste into the mailto draft after the form opens. Then keep every revision on the same thread.
Subject + body checklist
-
Subject line pattern Example shape:
Dashitou RFQ — [Company] — [Family or node] — Rev [X]. Keep it short and searchable. Do not invent a reference UUID. -
Body: identity Company, country, contact name, and reply-to if different from the sending account.
-
Body: node + load One sentence install node (e.g. stone panel → concrete backup; beam/gusset bolted joint; equipment baseplate → slab). Point to load-path primer language if helpful. Add load in buyer words when known (wind + dead, shear/tension, plant vibration note).
-
Body: file list File name(s), revision, units (mm default unless print says otherwise), and which sheet/detail is controlling. Prefer one controlling revision per part family on the first send.
-
Body: open items List what is still blank: tolerances, finish / coating, packing, private-label marking, qty band. Do not invent values to force a hard price.
-
What this handoff is not Not an order confirmation. Not a stock guarantee. Not a final price until specs, finish, qty band, and Incoterms are confirmed in the thread. Not a certificate pack — docs are shared privately when relevant (see About docs policy).
CTA for every revision: attach the controlling print in the same thread; reply in the same conversation when the drawing changes. Related: RFQ checklist · load-path primer · home buyer prep · contact What happens next 01–03.